Raising/Leveling Irrigation Heads

Proper installation depth and adequate trajectory are important for efficient sprinkler head performance.  Sprinkler heads with 3" risers cannot function properly if set or positioned 4"-5" below grade.  Factory specified performance (trajectory, radius, distribution uniformity) when applying water will be negatively impacted.  In addition, the existence of considerably below grade sprinkler canisters can pose hazards for golfers and workers alike.  With a large portion of our turf dormant in the cool season months we have ramped up our focus on raising and leveling priority sprinklers.
 
Poor grade impacting trajectory and required radius.
Applying water short of intended target.

Very low fairway/rough pair of heads.

Proper leveling and grade.


  

Drainage Basin Upgrade

During the rainy season in Southern California (hopefully November through to late March), drainage or the ability to mitigate water is a nemesis for most golf courses.  We are no different and given our soil composition, we battle "soggy" conditions in isolated areas throughout the entire year.  This January we addressed a problematic area just shy of our typical landing area on Hole #10.  This particular catch basin has sported a rope barrier to prevent cart traffic from intruding within the area since practically the day I started.  I'm confident that the addition of 4" slotted drain tile and gravel will alleviate the  requirement for roping and improve playability for those who land their shot within the vicinity.






Fairway and Rough Soils


Golf courses built within and on mountain settings provide variables that impact playability that not many golfers consider when evaluating conditioning.  These variables cannot be seen so it is unlikely that they would be factored in by the uneducated eye.  In all of my years of experience in the golf business, I can tell you that a cost saving measure implemented by the developer, project manager, or builder early on will likely be paid ten fold by the new owner, new developer, and current and future Superintendent.

In a typical construction, the project documents would call for stripping/harvesting, stockpiling, and then re-distribution of topsoil across approved, graded golf features.  In some instances, sand capping is recommended.  That process would include importing 6"-10" of sand and "capping" the sub-grade to provide adequate drainage and an expectable growing medium for turf.  This is typical of sites with poorly draining soils and/or sites with minimal top soil.  Course design and soil percolation (infiltration rate/drainage) are critical elements to the present and future playability of a course. 

A common comment/complaint regarding Champions Club playability is related to course moisture levels.  We are constantly evaluating irrigation application rates (utilizing several forms of technology) and implementing cultural practices (venting, slicing, and tining) to improve playability.  I think it is important for those interested in knowing what sort of soil medium we are functioning on.  The photos below will give you an idea of the lack of topsoil, hard pan/compact soil that resides below 95% of the turfgrass.  Irrigation infiltration rates are extremely low and sheeting of water just below the sod surface is very typical.  We will continue to observe irrigation practices, install drainage, and mechanically fracture the soil to improve playability.  Please understand this is a lengthy process and will yield results over the long haul. 





   

Ugly Irrigation Leak

Managing irrigation at Champions Club is challenging given the drastic elevation changes, course design element favoring collection areas, and poor soil composition limiting infiltration.  With these variables in place and subsequent potential areas of high water velocity within the sub-surface piping, the system is prone to wear and fitting failure.  Below is a not so beautiful example of a failure we recently experienced near the steps leading to #14 green.

Poor as-built diagrams allowed the water to run longer than we all would have liked as the isolation valve noted on the plans did not stop the flow of water.  A flaw in construction that I will discuss in a later post is noted in the middle photograph.  A "collar dam" and created low limits positive surface drainage and forces water to potentially sit for extended periods of time.  The result can cause anaerobic conditions (black layer) and turfgrass decline in these isolated areas.




Off Color Greens


Why do putting green grasses turn red, blue, or purple?  The cool to cold temperatures trigger the color responses.  During mid to late December and into January, many regions experience relatively warm days (65 to 75°F; 17 to 24°C), but cool nights (32 to 55°F; 0 to 13°C).  The sunny, bright, and warm days stimulate plants to produce large amounts of sugars (through photosynthesis) in leaf blades and sheathes.  At night, the sugars must be translocated out of the leaves to crowns for storage or use in other physiological processes.  When nights are very cool or frosty the sugars are not completely moved out of the leaves and they accumulate.  There are many types of sugars.  Glucose is a common plant sugar and sometimes glucose molecules are chemically bound with anthocyanins.  Anthocyanins are pigments and their function in plants is unclear.  They provide the red, purple, and blue colors in flowers.  Anthocyanins are always present in leaves, but normally are masked by the presence of chlorophyll.  They are expressed in the foliage of trees during cool and bright weather to provide the spectacular colors in autumn leaves.  Hence, bentgrasses may experience a similar accumulation of sugar, and therefore anthocyanins, following the first cool or frosty night of fall.  Frost injury may denature the green chlorophyll, thereby exposing the anthocyanin pigment.  These colors may intensify and persist throughout winter months and slowly disappear in mid-spring after the turf begins active growth.   Note the unique variety of lime green colored poa annua in the middle of the photo.  


Opening Sight Corridors

Select pruning of vegetative overgrowth in key areas has opened up lost sight corridors on the golf course.  The photo below is the view from the white tee on Hole #13.  The image on the left was taken prior to the pruning and the image on the right is the current view, post pruning.   Additional pruning on Hole #14 and Hole #16 will take place in the coming days with the same objective in mind.


#12 Greenside Bunker Lining

The recent redesign (2011) and resulting reduced square footage of the front-middle hazard protecting the green has hopefully saved a few strokes from one's game.  Lining bunkers with synthetic fabric to prevent contamination has been a standard practice for the past decade.  The benefits and longevity out way the negatives and cost a majority of the time, but ONLY if the liner is installed correctly and adequate sand is maintained within the hazard.   There are several pitfalls to avoid during the installation process and the most important one is to not skimp on the number of staples installed.  The staples secure the liner to the sub-floor and prevent the liner from lifting when snagged by raking or golf clubs.  In practice, I've learned that 8" is the minimum distance you want to space staples and they need to spaced no more than 4" apart on the seams and edges.  Installation of the liner should also mimic that of shingles on a roof.  The liner on Hole #12 had failed and required replacement for multiple reasons, but number one and number two on my list were lack of adequate stapling and lack of sand depth.

Only 1" of sand depth in most areas of the bunker

Removal of old liner and regrading of the sub-floor

Proper liner installation and adequate staples (1000+ staples for 450 sq ft)

Installing staples (mechanical staple guns can be used on large projects)

This is the volume of sand within the bunker to create a depth of 4"- more sand to be added