This week we added a smile drain to the front left side of #18 green to address the pooling of water and to alleviate the weak turfgrass conditions that are the result of it. We also raised and leveled the pair of irrigation sprinklers and quick coupler within close proximity to the project location.
No comments:
Post a Comment